• Custom Metal Frame Work Industry Metal Fabrication Pipe Bending Production Go Kart Frame
  • Custom Metal Frame Work Industry Metal Fabrication Pipe Bending Production Go Kart Frame
  • Custom Metal Frame Work Industry Metal Fabrication Pipe Bending Production Go Kart Frame
  • Custom Metal Frame Work Industry Metal Fabrication Pipe Bending Production Go Kart Frame
  • Custom Metal Frame Work Industry Metal Fabrication Pipe Bending Production Go Kart Frame
  • Custom Metal Frame Work Industry Metal Fabrication Pipe Bending Production Go Kart Frame

Custom Metal Frame Work Industry Metal Fabrication Pipe Bending Production Go Kart Frame

Standard: Custom
Tolerance: +/-0.10mm
Surface Treatment: Powder Coated
Samples:
US$ 25/Piece 1 Piece(Min.Order)
| Order Sample
Freight consultation with customer service
Customization:
Shipping Cost:

Estimated freight per unit.

about shipping cost and estimated delivery time.
Payment Method: visa mastercard discover JCB diners club american express T/T
  Initial Payment Full Payment
Currency: US$
Return&refunds: You can apply for a refund up to 30 days after receipt of the products.
From payment to delivery, we protect your trading.
Custom Metal Frame Work Industry Metal Fabrication Pipe Bending Production Go Kart Frame pictures & photos
Custom Metal Frame Work Industry Metal Fabrication Pipe Bending Production Go Kart Frame
US $25-50 / Piece
Min. Order: 50 Pieces
Diamond Member Since 2019

Suppliers with verified business licenses

Secured Trading Service
Manufacturer/Factory & Trading Company

Basic Info.

Model NO.
YS-200312
Machining Method
Cutting, Lathing, Welding, Grinding, etc
Material
SPCC
Service
Custom Service
Transport Package
Plastic Bag, Foam, Kaa Carton, Paper Angle Bead
Specification
Custom
Trademark
YISHANG
Origin
China
HS Code
7308900000
Production Capacity
5000PCS/Month

Packaging & Delivery

Package Size
100.00cm * 40.00cm * 10.00cm
Package Gross Weight
5.000kg

Product Description

Custom metal frame work industry metal fabrication pipe bending production go kart frame
Custom Metal Frame Work Industry Metal Fabrication Pipe Bending Production Go Kart Frame
Why is Yishang your preferred supplier?
1. Free technical analysis and accurate quotation within 24 hours.
2. The production cycle is fast, the delivery time of simple sheet metal parts is 3-5 days, and the delivery time of complex sheet metal parts or sheet metal enclsures is 10-12 days.
3. The quality inspection is strict, and the product is 100% exempt from inspection.

Product Name Custom metal frame work industry metal fabrication pipe bending production go kart frame
Technology Laser Cutting, CNC bending
Material Iron, Stainless Steel, Aluminum, Galvanized Steel
Dimension Same as drawings.
Color Colors in Pantone can be made.
Surface Treatment Iron: powder coated, painted, galvanized or chrome plated.
Delivery Time Sample: 2 - 3 days. Bulk order: 10 - 12 days.
Services Professional custom sheet metal fabrication services.

Packaging and Transportation

The packaging method of the metal processing maching parts are that whtie foam, plastic bag and export KAA carton which can protect the metal products from damage.

The metal parts are packed individually and  can be printed with buyers' own trademarks. Customization of packing configuration is warmly welcomed.

Each package will be tested for collision to assure it is strong enough and won't have problem during the transportation. 

Custom Metal Frame Work Industry Metal Fabrication Pipe Bending Production Go Kart Frame

Custom Metal Frame Work Industry Metal Fabrication Pipe Bending Production Go Kart Frame
Custom Metal Frame Work Industry Metal Fabrication Pipe Bending Production Go Kart Frame
Custom Metal Frame Work Industry Metal Fabrication Pipe Bending Production Go Kart Frame
Custom Metal Frame Work Industry Metal Fabrication Pipe Bending Production Go Kart Frame


Custom Metal Frame Work Industry Metal Fabrication Pipe Bending Production Go Kart Frame
Custom Metal Frame Work Industry Metal Fabrication Pipe Bending Production Go Kart Frame
Custom Metal Frame Work Industry Metal Fabrication Pipe Bending Production Go Kart Frame

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

From payment to delivery, we protect your trading.
Custom Metal Frame Work Industry Metal Fabrication Pipe Bending Production Go Kart Frame pictures & photos
Custom Metal Frame Work Industry Metal Fabrication Pipe Bending Production Go Kart Frame
US $25-50 / Piece
Min. Order: 50 Pieces
Diamond Member Since 2019

Suppliers with verified business licenses

Secured Trading Service
Manufacturer/Factory & Trading Company
Registered Capital
295604.36 USD
Plant Area
6000 square meters