Yishang insists on 100% product inspection-free and 100% on-time delivery. Contact us immediately and you can enjoy the following services:
1. Free 3D sketches or renderings within 24 hours.
2. Accurate quote within 24 hours.
3. The delivery time of simple sheet metal parts is 3-5 days.
4. The delivery time of complex sheet metal or sheet metal enclosures is 10-12 days.
Product Name |
Factory Direct Manufacturing Sheet Metal Parts Metal fabrication Enclosure Products |
Technology |
CNC equipment machining |
Material |
SPCC, or can be stainless steel, galvanized sheet, electrolytic plate, etc |
Dimensions |
Customized size and design. |
Color |
Customized color. |
Surface Treatment |
Powder coated, painted |
Delivery Time |
Sample: 2 - 3 days. Bulk order: 10 - 12 days. |
Services |
Professional custom sheet metal fabrication services. |
|
There are three types of welding, which are structural combination welding, drawing and spot welding. The size, diagonal, angle, hole and so on can be moved or deformed. |
|
Surface treatment is the characteristics of powder spraying effect and quality inspection standards:
1. The color, luminosity, texture are corresponding to the color card that customer has confirmed.
2. The workpiece is not damaged and dropped welding.
3. The surface is not exposed, no black spots, the powder is not heap, no orange peel, no fingerprints. |